The Challenge: On-Site Construction Left Staff Without Parking
During a large construction project, Siemens faced an operational challenge. Their usual employee parking lot was taken over by building materials and site traffic, making it unavailable for daily use. To maintain normal operations, Siemens urgently needed to convert a nearby 57,000 sq. ft. grass field into a safe and reliable temporary parking lot for up to 250 vehicles.
Time was critical. The solution needed to be fast to install, strong enough for daily vehicle use, and suitable for soft ground without causing long-term damage.
The GroundGuards Solution: AlturnaMat Mats
GroundGuards recommended AlturnaMat, the ideal system for this type of temporary installation.
Weighing just 86 lbs, each AlturnaMat can be laid by hand without lifting equipment, making installation fast and cost-effective. The mats provide a robust surface with excellent traction and weight distribution, capable of withstanding repeated vehicle movements over several weeks.
Thanks to the straightforward joining system, GroundGuards’ team installed the entire parking lot quickly and efficiently. The job was completed ahead of schedule and within budget.
Results & Outcome: A Functional, Safe Parking Lot Delivered Ahead of Schedule
The result was a clean, well-structured 250-space parking lot that served Siemens staff throughout the seven-week project.
By using AlturnaMat, Siemens avoided major disruption, maintained employee access, and prevented any long-term damage to the grass field. The temporary parking lot looked professional and performed exactly as required, helping keep the project on track.